Skip to main content

Since our only solution to join two tables is Data Designer, we do end up with multiple DD that needs to run on a daily basis. Despite scheduling them in different times, there is only 24 hrs in a day!

So it would be good to assign a Priority score so that if there are multiple DD / Rule that has to run at the same time, the engine can use the Priority score to move the important ones to the top?

While we are there, it would help if we can add a flag “Run during lean times” where the Rules Engine

Be the first to reply!