Skip to main content
kelly
Helper ⭐️⭐️⭐️
June 15, 2018
New Idea

Ability to break the connections in Advanced Outreach

  • June 15, 2018
  • 14 replies
  • 194 views
It would be great if the Advanced Outreach canvas had the ability to delete a connection between two actions to insert additional steps, or, even better, if the actions were drag and drop. 

It's extremely redundant to build a 10 step outreach to realize you'd like to change from a wait step to a conditional wait step at say, the second step. Or if you want to add a CTA step between 6 and 7. Currently, you have to delete all steps following where you'd like to make the change, and with that, all of the settings of the deleted steps (like all details in a Create CTA action). Then you have to re-add the deleted steps. 

Instead, I'd like to be able to delete the link on either side of the action I want to change, and should be able to insert additional actions before or after any action.

    14 replies

    sai_ram
    Expert ⭐️⭐️
    January 7, 2021

    @sai_ram please see previous comment, workaround provided is an incorrect status applied to this topic.

    @kelly changed and redirecting to product team. Thanks!

    nitisha_rathi
    Expert ⭐️⭐️
    January 8, 2021

    We are in the process of redesigning JO and ability to add/ delete steps in between is one of the enhancement which we would add with the redesign. ETA H1 2021.

    kelly
    kellyAuthor
    Helper ⭐️⭐️⭐️
    November 1, 2021

    @nitisha_rathi any update on the JO redesign? Similar to this post, there is a major need to revamp how program flow logic functions currently. 

    Cornelia
    Contributor ⭐️⭐️⭐️⭐️⭐️
    November 2, 2021

    Hey @chethana could you please look into this and help with a quick update here?