New Idea
If anything is changed on CTA, CTA status should change from "New" to "Work in Progress".
If anything is changed on CTA by our CSMs, such as CTA due date or any comments or posts recorded, should change from "New" to "Work in Progress". That shows that the CSM has engaged with the CTA to some extent.
At least having this option as a checkbox ("Change Status Based on Activity" on the Cockpit Configuration section on the admin page on Gainsight) would be great.
At least having this option as a checkbox ("Change Status Based on Activity" on the Cockpit Configuration section on the admin page on Gainsight) would be great.