New Idea
Salesforce Connector: Include detail of what happened in the logs even when successful
I was hoping that when SF Connector replaced Gainsight Connect, it would also include information about WHAT records were pulled in by the jobs, as Gainsight Connect did not. That does not appear to be the case.
As I previously stated on that post:
"Sometimes you run into situations where something was a 'success' but it didn't perform the action you actually expected it to OR there was an issue of timing and you need to go back and track down where the disconnect happened. Success or Failure, we should always be able to track events that happened in detail."
As I previously stated on that post:
"Sometimes you run into situations where something was a 'success' but it didn't perform the action you actually expected it to OR there was an issue of timing and you need to go back and track down where the disconnect happened. Success or Failure, we should always be able to track events that happened in detail."