Skip to main content
manda.edmonds
Contributor ⭐️⭐️⭐️⭐️
September 16, 2025
New Idea

Timeline activity date should exactly match sent time for email logs V2

Related products:CS Timeline & Activity Tracking
  • September 16, 2025
  • 0 replies
  • 16 views

In order to be able to analyze items, either:

 

  1. Email logs V2 should be connected with timeline via a look-up AND/OR
  2. Email logs V2 sent time should be exactly the same as the activity timeline activity date

There is a disconnect that prevents merge and analyze on their fields