I have been trying to figure out how to track my own changes to production engagements so that I can remember or advise what was adjusted if someone asked. I attempted to use the Description field, but it’s not a good or long-term solution.
If would be awesome if there was the ability (to set as required or not) a comment when saving or launching an engagement that is connected to the production environment. I am even fine with all environments, but maybe we could say optional if not connected/launched to Prod, then required when connected/launched to Prod.
Even if, in the first phase we had to query a database to get the information.