Skip to main content

Hello! Minor QOL thing here that may cause some confusion and seems like a low hanging fruit. Currently, when a rule is part of a rule chain and changes are made to the Status of the chain (ie: it is deactivated) the individual rule will continue to show as Active and the Next Run field in the summary shows whatever date and time the “next run” would have been before the chain was deactivated.

 

This can be slightly confusing when browsing through the rules list and has caused me to do several double-takes in the last week or so. It would be fantastic if the Status of the individual rules in a chain was updated to match the status of the chain after changes were made.

In the spirit of rules and rule chains consistency, can everything also either say “Partial Success” or “Partial Failure”, not a mix of this in different areas.


Reply