Question
Shared C360 - Control on date formatting
Does the Shared C360 support date formatting?
I have added two date fields to the Shared C360 view, but the two fields are fomatted two different ways:
One field is formatted yyyy-mm-dd
Another field is formatted mm/dd/yyyy
They are the very same fields I have added to my 'in-platform' C360 where both fields follow my desired mm/dd/yyyy format. I have not located a way to control the formatting of the date.
I have added two date fields to the Shared C360 view, but the two fields are fomatted two different ways:
One field is formatted yyyy-mm-dd
Another field is formatted mm/dd/yyyy
They are the very same fields I have added to my 'in-platform' C360 where both fields follow my desired mm/dd/yyyy format. I have not located a way to control the formatting of the date.