We are finding that CSMs like to “bundle” their work to complete multiple units of work in a single performance coaching CTA / call. My idea is to allow multiple Playbooks to be associated with a single CTA. For example, we might create 3 CTAs to the CSM that they ultimately plan to address in a performance call.
CTA-A, Playbook 1: fires 3/1
CTA-B, Playbook 2: fires 3/5 (we wouldn’t know on 3/1 this is happening)
CTA-C, Playbook 3: fires 3/20 (we wouldn’t know before 3/20)
The CSM already had a call scheduled for 3/25 and the requests are not urgent enough to warrant a stand-alone call. Ideally, CSMs could add Playbooks 2 & 3 to CTA-A and have everything centralized for the talking points, follow-up, and timeline entries related to all 3 playbooks.
Ideally, we would as admins love to be able to bundle these processes together for the CSMs without having to re-create the same tasks in multiple playbook for every possible configuration. It would be ideal to have logic that says, when CTA-C fires, if CTA-A is open, add Playbook 3 to CTA-A. I recognize that is a much bigger ask, but that would be a long-term vision.