Posting these 2 ideas on behalf of a customer, Please review and update here if these can be included in our road map.
- Currently our scheduled job runs by taking the last job run datestamp as the start date and the scheduled date as the end date. So here according to their use case it would be great if we use the last loaded date time for the particular field as the start date in the next schedule run because at the time of data run they have 1 hr of data missing which will be loaded into their snowflake later. As of now we have suggested them to create one system generated datetime field in their snowflake instance which can be used as a last modified timestamp.
- Is there a possibility to introduce all data sync as a scheduled run ?
We can sync to discuss on this further.